Surface Drainage Qatar

Image
 Surface Water Drainage Networks Muaither Storm water manhole and gullies connection activities in progress. Foul Sewer Networks Muaither Al Rayyan Municipality Qatar Foul Sewer Networks construction under Road & Infrastructure Development project in progress. Project daily dairy record update by Drainage & Utilities inspector Gulzar Mirza (CDM Smith Qatar)

Microtunneling Drainage

Image
Foul Sewer Microtunneling Microtunneling Boring Machine (TBM) jacking frame installation in progress at Foul Sewer Manhole 32A/T50/12/2/16/4. Surface Water Trench Surface Water trench excavation in progress inbetween MH 16/4 to 16/3 Sewer Drainage Manhole Foul Sewer MH 16/2/1 Excavation in progress Foul Sewer MH 16/6/1 Excavation in progress Kahramaa Ducts Type H Ducts Laying in progress at Zone 1D near Round About

Infrastructure Development Qatar

Image
Road & Infrastructure QCS 2014 Project Dairy Daily site Dairy record Zone 1 - 2 for foul sewer and surface water Manholes construction Zone 1A1 Foul Sewer Pipeline Trench

Road Infrastructure Qatar

Image
Utilities and Drainage Qatar  

Road Infrastructure Qatar

Image
ROAD  & INFRASTRUCTURE SITE UPDATE

Road and Infrastructure Doha Qatar

Image
 Drainage & Utilities Works Doha Qatar. Zone 1A site progress update and Record North West View Drainage  

Infrastructure Machines

Image
Road, Infrastructure and Drainage Qatar Drainage and existing Utilities Protection Works in progress at Zone 1B. Foul Sewer Microtunneling Manhole No. 32A/T50/12/2/1 and road works in progress Drainage Utilities TSE and road crossing ducts trenches in progress at Zone 1B (Ch1+700) Surface water open trench from MH-122-MT to MH-128-MT Manhole Update