Microtunneling Drainage
Foul Sewer Microtunneling Microtunneling Boring Machine (TBM) jacking frame installation in progress at Foul Sewer Manhole 32A/T50/12/2/16/4. Surface Water Trench Surface Water trench excavation in progress inbetween MH 16/4 to 16/3 Sewer Drainage Manhole Foul Sewer MH 16/2/1 Excavation in progress Foul Sewer MH 16/6/1 Excavation in progress Kahramaa Ducts Type H Ducts Laying in progress at Zone 1D near Round About