Microtunneling Drainage

Foul Sewer Microtunneling

Microtunneling Boring Machine (TBM) jacking frame installation in progress at Foul Sewer Manhole 32A/T50/12/2/16/4.
Foul Sewer Microtunneling

Surface Water Trench

Surface Water trench excavation in progress inbetween MH 16/4 to 16/3
Foul Sewer Excavation

Sewer Drainage Manhole

Foul Sewer MH 16/2/1 Excavation in progress
Foul Sewer MH 16/6/1 Excavation in progress

Kahramaa Ducts

Type H Ducts Laying in progress at Zone 1D near Round About