Microtunneling Drainage
Foul Sewer Microtunneling
Microtunneling Boring Machine (TBM) jacking frame installation in progress at Foul Sewer Manhole 32A/T50/12/2/16/4.
Surface Water Trench
Surface Water trench excavation in progress inbetween MH 16/4 to 16/3Sewer Drainage Manhole
Foul Sewer MH 16/2/1 Excavation in progressFoul Sewer MH 16/6/1 Excavation in progress
Kahramaa Ducts
Type H Ducts Laying in progress at Zone 1D near Round About
Comments
Post a Comment