Infrastructure Machines

Road, Infrastructure and Drainage Qatar

Drainage and existing Utilities Protection Works in progress at Zone 1B.

Foul Sewer Microtunneling Manhole No. 32A/T50/12/2/1 and road works in progress

Excavator and Boom Truck

Drainage Utilities

TSE and road crossing ducts trenches in progress at Zone 1B (Ch1+700)
Surface water open trench from MH-122-MT to MH-128-MT
Surface Drainage Manhole
Manhole Update


Comments

Popular posts from this blog

Surface Drainage Qatar